Skip to Content
Palomar College Learning For Success

105-18

South Education Center Offsite Intersection Improvement Project

Type of Project:The project consists of intersection improvements located at Rancho Bernardo Road and Matinal Road as well as Rancho Bernardo Road and Via Del Campo Road. The scope of work includes, but is not limited to temporary traffic control, phasing, demolition, paving, landscape and irrigation improvements, striping, signage, signalization, SWPPPs and maintenance as show on the plans and specifications prepared by Kimley-Horn.
Project Documents:Bid Docs
Plans

Bid Results
Prequalification Required:Contractors bidding on this scope must be prequalified by Palomar College.
Prequalification Process
Project Stage:Closed
"Mandatory" Conference/ Walkthrough:A MANDATORY pre-bid conference shall be held on Tuesday, April 4, 2018 at 10:00 AM in the Community Room at the South Education Center at 11111 Rancho Bernardo Road, San Diego, CA 92127. Attendance is MANDATORY.

Mandatory Pre-Bid Sign-in Sheet
Addenda:Addenda #Issued OnTitleDocument
14/18/18Addendum #1Addendum #1
24/26/18Addendum #2Addendum #2
35/24/18Addendum #3Addendum #3
47/13/18Addendum #4Addendum #4

PCCD Signed Plans (Mylar)
Closing Date:July 25, 2018, no later than 3:00PM
Document Delivery Location:Office of Contract Services
Room A-130, Administration Bldg.
1140 West Mission Road
San Marcos, CA 92069
Campus Map
Contact Information:Debbi Claypool, Contract Services, 760-744-1150 ext. 2129 / dclaypool@palomar.edu